Install
- 877articles · 30d
- 9+ hour agolatest article
- Aug 16, 2026earliest in window
- 77%with images
- 347avg words
- india 347
- cities 313
- urban development 255
- sustainable cities 228
- karnataka 221
- bengaluru 206
- urban mobility 204
- climate resilience 199
- telangana 189
- hyderabad 187
- mumbai 160
- business 152
- mumbai news 151
- public transport 143
- urban infrastructure 127
- ani edit 118
- nation and beyond 113
- sustainable transport. 113
- sustainable transport 109
- national 107
- Economy, Business & Finance 326
- Transportation 296
- Travel & Transportation 219
- News 130
- Environment 104
- Politics2 102
- Industrial 100
- Crime & Law 89
Please confirm you are human
This browser or connection looks automated. Press and continuously hold the control for 3 seconds to enable Google-hosted web results and, when separately allowed, AI-assisted answers.
A successful check enables 100 search requests. Interactive access does not authorize scraping, systematic collection, or reuse of search output.
News
Mumbai Metro Line 9 Phase 2 Testing Begins
11+ hour, 31+ min ago (295+ words) The testing is intended to prepare the three additional stations planned under Line 9 Phase 2 for integration with the operational Line 9 Phase 1 and the existing Metro network. The work will include signalling and train trials required before the new phase can…...
Mumbai Coastal Road Traffic Rises, But Misses Projections
1+ day, 6+ hour ago (295+ words) Mumbai Coastal Road has become substantially busier since it began operating around the clock, but its first year of 24×7 use also exposes a wider limitation of road-led urban planning: higher traffic on a new corridor does not by itself establish…...
Krishnapatnam Port Targets 25M Tonnes of Rail Freight
1+ day, 13+ hour ago (423+ words) South Coast Railway has reviewed freight infrastructure and operational bottlenecks around Adani Krishnapatnam Port and nearby railway stations as the port targets 25 million tonnes of cargo movement by rail in the current financial year. South Coast Railway Principal Chief Operations…...
Bengaluru Flyovers Plan Targets 25 Traffic Choke Points
1+ day, 12+ hour ago (260+ words) Bengaluru Traffic Police have proposed 25 new flyovers and underpasses at congested junctions and railway crossings as the city’s vehicle population approaches 1.50 crore and traffic pressure intensifies across major corridors. A senior traffic police official said adaptive traffic signals had received…...
Pune Metro Announces Ganesh Festival Service Changes
4+ day, 2+ hour ago (304+ words) Pune Metro will increase train frequency and extend services during the Ganesh festival to manage the expected rise in commuter and devotee traffic across the network, MahaMetro said in an announcement reported on September 10. During peak periods of the festival,…...
Bengaluru Traffic Plan: What 25 New Flyovers Mean
4+ day, 8+ hour ago (802+ words) urbanacres.in Bengaluru Traffic Plan Puts Flyovers Against a Growing Mobility Crisis Bengaluru traffic police have proposed a new package of flyovers and underpasses at locations across the city, arguing that targeted grade separation is needed to ease congestion at…...
Bengaluru AI Road Survey to Cover 75 Km
5+ day, 11+ hour ago (326+ words) Subheadline: The Bengaluru South City Corporation says its pilot system will identify road defects, encroachments, waste and other civic problems and route them to officials for action. The Bengaluru South City Corporation (BSCC) has launched a pilot Bengaluru AI road…...
Thane Internal Circular Metro Faces Fresh Public Scrutiny
6+ day, 7+ hour ago (248+ words) Aditya Thackeray is scheduled to meet residents in Balkum, Thane, on Tuesday to discuss objections to the proposed Thane internal circular metro and Amazon’s proposed hyperscale data centre in the area. He is expected to hear residents’ concerns and speak…...
Thane Internal Metro Route Raises Rehabilitation Questions
6+ day, 2+ hour ago (734+ words) urbanacres.in Thane Internal Metro Route Puts Rehabilitation Before Expansion A dispute over the proposed Thane internal metro route through Lokmanyanagar has exposed a larger question facing transport projects in built-up cities: can a new corridor be justified if the…...
Panvel-Vasai Railway Corridor Awaits Final Approval
6+ day, 7+ hour ago (946+ words) urbanacres.in Panvel-Vasai Railway Corridor Tests Mumbai’s Regional Connectivity The proposed Panvel-Vasai railway corridor has reached a familiar but consequential stage in metropolitan infrastructure planning: a state-level approval has been secured, yet construction cannot begin because the project is still…...